You don't have javascript enabled. Good luck with that.
Pencarian
 Rp 3,1 Miliar Disiapkan Untuk Bangun Tiga Saluran Phb di Jaktim
.
photo Nurito - Beritajakarta.id

Three Connecting Channels to Be Built in East Jakarta

East Jakarta Water Resources (SDA) Sub-department has allocated Rp 3.1 billion from City Budget (APBD) 2019 to build three connecting (PHB) channels in East Jakarta. According to the plan, 160 meters channel will be built on Jalan Pondok Ranggon, 150 meters channel on Jalan Raya Asyafiiyah Cilangkap, and 110 meters channel on Jalan Mini I, II, III Bambu Apus.

We plan to start auction in March thus its construction could be started in May or June

"We plan to start auction in March thus its construction can be started in May or June," stated Mustajab, Head of East Jakarta SDA Sub-department, Saturday (2/9).

SDA Personnel Repair Kalibaru PHB Channel's Collapsed Retaining Wall

Most PHB channel is planned to have width of 80 centimeters and depth of 80 centimeters. Particularly on Jalan Mini I, II, and III its width reaches 1.2 meters. Then all channels use U-ditch concrete for its construction.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye660 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing